Crash Course · Beginner → Advanced
Operations and Supply Chain Management: Crash Course
See how businesses turn inputs into products and services, plan capacity and inventory with EOQ and reorder points, improve quality with Lean and Six Sigma, and run a supply chain from supplier to customer.
Beginner → Advanced15 min readInterview Q&A
- In One Line
- The Transformation Model
- The 4 Vs of Operations
- Capacity and Process Performance
- Inventory Management and EOQ
- Reorder Point, Safety Stock and Turnover
- ABC Analysis
- Lean Operations and the 8 Wastes
- Quality Management and Six Sigma
- The Supply Chain: Plan, Source, Make, Deliver, Return
- The Bullwhip Effect
- Key Takeaways
- Interview Questions
- Exam Quick Revision
- Continue the Business Administration Path
In One Line
The Transformation Model
- Inputs: materials, labour, equipment, information, money.
- Transformation: manufacturing, assembling, storing, transporting, serving.
- Outputs: goods and services that customers value.
- Feedback: quality checks, customer reviews and data that improve the process.
A bakery turns flour, staff time and ovens into bread; a bank turns staff, software and money into loans and payments.
The 4 Vs of Operations
| Dimension | High | Low |
|---|---|---|
| Volume | Fast food chain: standardised, low unit cost | Fine-dining restaurant: flexible, higher cost |
| Variety | Custom tailor | Bottled water plant |
| Variation in demand | Holiday resort | Electricity base load |
| Visibility (customer contact) | Hotel front desk | Back-office processing |
High volume and low variety lower costs; high variety, variation and visibility raise costs but add flexibility.
Capacity and Process Performance
| Utilisation | How much of the possible capacity is used. |
| Bottleneck | The slowest step; it limits the output of the whole process. |
| L | Average number of items (or people) in the system. |
| λ (lambda) | Arrival rate — items per unit of time. |
| W | Average time each item spends in the system. |
Example (Little’s law): 20 customers arrive per hour and each spends 15 minutes (0.25 h) in a shop → L = 20 × 0.25 = 5 customers inside on average.
Inventory Management and EOQ
Inventory protects against uncertain demand and supply, but costs money to store. The Economic Order Quantity balances ordering costs and holding costs.
| D | Annual demand in units. |
| S | Cost of placing one order. |
| H | Holding cost per unit per year. |
Example: D = 12,000 units, S = 50, H = 2 → EOQ = √(2 × 12,000 × 50 ÷ 2) = √600,000 ≈ 775 units per order, about 12,000 ÷ 775 ≈ 15–16 orders a year.
Reorder Point, Safety Stock and Turnover
| d | Average daily demand. |
| L | Lead time in days (order to delivery). |
| SS | Safety stock — buffer for uncertainty. |
| COGS | Cost of goods sold in the year. |
- ROP example: d = 40 units/day, L = 5 days, SS = 100 → reorder when stock falls to 40 × 5 + 100 = 300 units.
- Turnover example: COGS 600,000 ÷ average inventory 100,000 = 6 times a year → about 365 ÷ 6 ≈ 61 days of inventory.
ABC Analysis
| Class | Typical share of items | Typical share of value | Control |
|---|---|---|---|
| A | ~10–20% | ~70–80% | Tight: frequent counts, accurate forecasts |
| B | ~30% | ~15–25% | Moderate |
| C | ~50–60% | ~5% | Simple rules, bulk ordering |
ABC is the Pareto principle applied to inventory.
Lean Operations and the 8 Wastes
Lean (from the Toyota Production System) removes everything that does not add value for the customer. Remember the 8 wastes as DOWNTIME:
- Defects — rework and scrap
- Overproduction — making more than needed
- Waiting — idle people or machines
- Non-used talent — ignoring people’s ideas
- Transport — unnecessary movement of goods
- Inventory — excess stock
- Motion — unnecessary movement of people
- Extra processing — doing more than the customer needs
Just-in-time (JIT) produces only what is needed, when needed. Kaizen means continuous small improvements by everyone. 5S organises the workplace: sort, set in order, shine, standardise, sustain.
Quality Management and Six Sigma
- Total Quality Management (TQM) — quality is everyone’s job, focused on customers and continuous improvement.
- Six Sigma — reduce variation so processes produce no more than about 3.4 defects per million opportunities.
| DMAIC step | Question |
|---|---|
| Define | What is the problem and the goal? |
| Measure | How is the process performing now? |
| Analyse | What are the root causes? (5 Whys, fishbone diagram) |
| Improve | What changes fix the causes? |
| Control | How do we keep the gains? |
The Supply Chain: Plan, Source, Make, Deliver, Return
- Plan — forecast demand and balance it with supply.
- Source — select suppliers, negotiate contracts (procurement), manage supplier risk.
- Make — produce the goods or services.
- Deliver — warehousing, transport, order fulfilment, last-mile delivery.
- Return — reverse logistics for returns, repairs and recycling.
These five processes come from the SCOR model, a widely used supply-chain reference framework.
The Bullwhip Effect
Small changes in customer demand become larger and larger swings in orders further up the chain (retailer → wholesaler → manufacturer → supplier).
- Causes: forecasting from orders instead of real sales, ordering in big batches, price promotions, panic ordering during shortages.
- Fixes: share point-of-sale data, smaller and more frequent orders, stable pricing, vendor-managed inventory.
Key Takeaways
- Operations turn inputs into valued outputs.
- The 4 Vs shape cost and flexibility.
- EOQ = √(2DS/H); ROP = d × L + SS.
- Little’s law: L = λW.
- Lean removes the 8 wastes; Six Sigma cuts variation with DMAIC.
- Supply chain: plan, source, make, deliver, return; share data to stop the bullwhip.
Interview Questions
What is operations management?
Designing and running the processes that turn inputs into goods and services efficiently and at the right quality.
Explain the EOQ model.
EOQ = √(2DS/H) finds the order size that minimises the total of ordering and holding costs.
How do you calculate the reorder point?
Reorder point = average daily demand × lead time + safety stock.
What is the bullwhip effect?
Demand fluctuations growing larger as they move up the supply chain, caused by poor information sharing, batching and over-reaction.
What are the 8 wastes of Lean?
Defects, overproduction, waiting, non-used talent, transport, inventory, motion and extra processing (DOWNTIME).
What is DMAIC?
The Six Sigma improvement cycle: Define, Measure, Analyse, Improve, Control.
What is just-in-time?
Producing or receiving goods only when needed, to cut inventory and waste — it requires reliable suppliers.
Explain Little’s law.
The average number of items in a system equals the arrival rate times the average time each spends in it (L = λW).
Exam Quick Revision
- Transformation: inputs → process → outputs → feedback.
- 4 Vs: volume, variety, variation, visibility.
- Utilisation = actual ÷ design capacity.
- Little’s law: L = λW.
- EOQ = √(2DS/H).
- ROP = d × L + SS; turnover = COGS ÷ average inventory.
- Lean 8 wastes: DOWNTIME.
- Six Sigma: DMAIC, 3.4 DPMO.
- SCOR: plan, source, make, deliver, return.